Profound Engineering has provided engineering services for the Winnipeg South Eng Water treatment Expansion Project as follows:

Workshop drawings for 1000 MT Pipe racks for Bio reactor buildings.
New Duct System structural supports.
Generator building structural framing.
Chemical building mezzanine platforms design.
Various structural and misc. projects around the new plant.
Evaluation of Sluice system conveyor integrity.
Assessment of various mechanical equipment installation procedures.
Multiple overhead crane installations.
Numerous equipment installation assessment and repairs.